RICKY RAGHUNANAN GROUP
ADVANCE SCAFFOLDING LIMITED
BLEACHERS
Bleachers or stands are raised, tiered rows of benches found at sports fields and other spectator events. Stairways access the horizontal rows of seats, often with every other step gaining access to a row of benches. Benches range from simple plank benches to more elaborate benches with backrests. Many bleachers are open to the ground below so that there are only the planks to sit and walk on.
ASL bleachers are designed specifically for the neighborhood athletic fields, show grounds, movie sets, etc.; and provide comfortable yet compact seating for small and large crowds. We offer two types of bleachers: pre-assembled and universal (has to be assembled). Bleachers can be arranged to accomodate:
• 3 Rows – 33 persons
• 7 Rows – 77 persons
• 10 Rows – 110 persons
• 15 Rows – 159 persons
Our bleachers can be built to any size based on a 6′ wide by 10′ deep footprint. These can be built as wide or as deep as one desire..
INTRODUCTION
Incorporated in 2008 Advance Scaffolding Limited (ASL) has grown to become one of the leading supplier in scaffolding services with in the Caribbean.With comprehensive knowledge in Scaffolding design and the erection and dismantling of scaffolding structures across the region ASL is fully capable of meeting the needs of the construction industry, petrochemical industry, service and maintenance companies, residential and commercial sectors.
With over 150 full time scaffolders who are all trained and hold scaffolding qualifications we are fully committed to the health and safety scheme.ASL has an in house maintenance team keeping all working materials fully serviced and in tip top condition at all times . Our extensive portfolio of equipment enables us to respond to the needs of any situation within a very demanding sector. We also operate a large fleet of vehicles giving us all the logistical means to transport our equipment safely and efficiently.we are committed to offering a 24hour, 7 days a week service.
Speciality Services:
• Rental and Rigging of scaffolding
• H Frames Scaffolding
• Access stairs
• Catwalks
• Guardrails
• Shoring
• Stages
• Swing stage
• Bleachers
• Construction fencing
• Trussing
• All types of ladders and Scaffolding Accessories
CUP LOCK SCAFFOLDING
Why Choose Cuplock ?
The Cuplock system is the safest option. Cup lock is a unique node point connection allows up to four horizontal members to be connected to a veritical members in one single action - without the use of nuts and bolts or wedges. The locking device is formed by two cups. Single node point action of unique locking make 'cuplock/Cuplock' a fast, versatile and optimized system of scaffolding for scaffolding for construction, demolition and maintenance projects. With our 42 000 sq ft of warehouse space, makes us ithe largest supplier of scaffoling in the region. Silent Features:
• Cuplock system - Easy to STAND - say no to nuts and bolts or wedges
• Just a simple locking cup at each node point on the standards enables connection of the ends of up to four members in one locking action
• Cuplock systems- Versatile!
• Best suitable for access or formwork support.
• Cuplock systems- Timely tested and Proven design with safety accessories
• Cuplock System has a proven performance history on an extensive number of sites, meeting the requirements of the various statutory bodies.
• Quick fastening of horizontals. Only 4 horizontals can be fastened at one time with firm clamping action of top cup making the joint rigid.
• Quick/Fast/Solid erection and dismantling results in time and labour saving.
• Widely and Versatile use in construction, demolition or maintenance projects for any type of structure i.e. straight or curved.
• Lightweight but high loads carrying capacity.
• Low maintenance.
We have designed and erected some of the most complicated cup-lock jobs in the country to date. in all sectors from, comercial to industrial to residential projects.
CARNIVAL
There is no Trinidad and Tobago Carnival without Advance Scaffolding Limited, our team designs, constructs and erects 90 percent of the infrastructure that makes the carnival season the greatest show on earth!!!.. Our team erects and maintains the 200ft x 60ft stages at the Queens Park Savannah, Port of Spain, Skinner’s Park San Fernando and even the Soca Dome at the Jean Pierre Complex.
We are OSHA certified and with our impeccable reputation for safety we take on this and every task with the most stringent safety measures in place, all our stages are inspected and certified by Phillip Enginering Limited. These stages are made with every thinkable precautionary measure in place because they are expected to sustain traffic of over three hundred thousand persons, entire steel bands, massive king and queen costumes and all manner of props crossing for the entire carnival season.
The stages are just the beginning of what we do for the season, the erection of the biggest party on earth... The Greens which is held at the Queens Park Savannah for Panorama Semi-Finals is also a project erected and maintained by Advance Scaffolding Limited, which is also inspected and certified by Phillip Engineering Limited.
Queens Park Savannah Port of Spain
• Main Stage 200ft x 60ft • Fencing • Decking • Trussing • Barriers • P.A Towers • Judging Point • Camera Towers • Port-A-Floor • The Greens (full infrastructure)
Soca Dome Jean Pierre Complex Port of Spain
• Main Stage • Fencing • Decking • Trussing • Barriers • P.A Towers • Judging Point • Camera Towers • Port-A-Floor
Skinner’s Park San Fernando
• Main Stage 200ft x 60ft • Fencing • Decking • Trussing • Barriers • P.A Towers • Judging Point • Camera Towers